Wednesday, September 15, 2010

Insulation, Drywall, Electrical and Plumbing begins


We are dry-walling the mechanical mezzanine to allow for installation of the mechanical units, ductwork, and schedule 40 sprinkler pipe


The studs and electrical boxes have been marked on the floor to insure that no electrical boxes are covered up and to have a visual of what is in the wall.



Still no rain in sight. 