Tuesday, August 31, 2010

Setting Trusses


Trusses were set and braced



While we had the crane we took down the old steeple. The new steeple is on its way



Roof framing continues with the 16" I joists



6" pipe bollards set at dumpster pad

Monday, August 30, 2010

Framing continues


The weather looks good this week!








The walls were blocked and braced in preparation for setting trusses tomorrow. The existing shingles had to be removed to allow for the tie in walls and over build.

Wednesday, August 25, 2010

Backfilling curbs

                                   


Framing should begin tomorrow and there is no rain in sight!

Tuesday, August 24, 2010

Slab, curbs and lumber!


The slab is now poured!




The lumber was delivered today along with the roof trusses.




The curbs at the new parking lot were poured.

Friday, August 20, 2010

Building slab prep and steel reinforcing


The termite treatment was applied, 10 mil plastic installed, and #4 rebar at 18" centers each way tied in preparation for tomorrows pour. 


Thursday, August 19, 2010

Prep for parking lot and building slab



There is a 50% chance of rain on Sunday. Luckily all grade beams have been poured.


The parking lot has been graveled and compacted and is ready for curbs which are coming Monday.




The building pad has been leveled and compacted. Forming and gravel has begun.